David Beckham Academy Ventilation System
David Beckham Academy Ventilation System David Beckham Academy Ventilation System

David Beckham Academy Ventilation System

Client: AEG Europe    Year of Completion: 2008

As original manufacturers of the David Beckham Academy structure, we were asked to design and install a ventilation system.

Air exchange and movement analysis was undertaken to establish the requirements for the ventilation system for such a vast area. Using a combination of inlet and extract fans the required air exchange rate was archived.

The ventilation system is controlled using a Moeller PLC Modbus unit. Each fan has a Moeller inverter motor drive networked up with a Modbus touch screen controller which controls all fans from a central location. The control system has a number of presets for time and fan speeds, it’s also possible to override the current running preset, in a similar fashion to a central heating controller. The touch screen also reports back on the status of the fans.

Location

London, UK

Market Sector

Sports and Leisure

Scope of Works

Design, Manufacture, Project Management, Install

Function

Interactive, Remote Diagnostics

Datasheet

Download a PDF datasheet for this project: click here.